[
Back to Top]
Remittance 835
- With this release, a message to download the PDF for detailed information will be displayed for Remittance 835 under the Remittance Reportsection.
- For remittances with a large amount of data, the first 500 characters will be displayed under the Remittance Report section. To view the detailed Remittance Report users will need to download the PDF version of the Remittance 835 by clicking on the ‘Download PDF’ button. A message will be displayed at the bottom of the Remittance report to download the detailed report.
Attendance
- For Attendance type where the Time-In/Time-Out required field is set to Yes, users will be able to update a time-slot on the attendance grid without the Time-In/Time Out information.
- The warning message on the Attendance Data Update page for updating attendance data without Time-In/Time-Out information has been modified.
Individual Support Plan
[Back to Top]
- When an Individual Support Plan form is printed by clicking on the ‘Display PDF’ button, information from the Individual Support Plan will appear in standard letter sized (8.5″ x 11″) pages. Users may refer to the Individual Support Plan Guides for more information.
ISP Program
[Back to Top]
With this release, Oversight agency users will be able to select themselves as Program Authors when creating or editing ISP Programs by switching to the Linked Providers accounts. Their names will be available in the Program Author drop down menu appearing under the ‘Other Details’ section of ISP Programs. Previously, Oversight agency users were not able to locate themselves in the drop down list to assign themselves as Program Authors in ISP Programs under the Linked Provider accounts.
General Event Reports
[Back to Top]
With this release, the California Follow-up Form has been updated:
- The Level 2 and Level 3 labels has been re-designed.
- Other Target field will be displayed below the Other Target Date field
- The ‘Action Taken’ field has been renamed to Action Completed. A new field Action Completed Date has been introduced.
- Two new fields SART Requested and SART Completed have been introduced under Level 3 section.
- The Surveyor Outcomes section has been re-designed and new sections have been added. The following sections have been introduced under the Surveyor Outcomes:
- ERI
- Deficiency
- Citation
- Disability Rights
- OPS
- Investigations
- Notifications
The previous options has been included in ERI, Deficiency and Citation sections respectively.

Leave A Comment
You must be logged in to post a comment.